Major projects:

A list of major investment projects completed in the years from 2007 to 2011:

  1. Steam feed for the new Spirax:
    Investor: Arctic Paper Kostrzyn S.A.
  2. Recovery and re-use of waste heat in the turbine house:
    Investor: Arctic Paper Kostrzyn S.A.
  3. Erecting anti-pressure steam and exhaust steam DN 500 pipelines from the turbine:
    Investor: Posteor Sp. z o.o.
  4. Modernisation of the steam- condensate system at MP1:
    Investor: Posteor Sp. z o.o.
  5. Replacement of banks of tubes of the steam superheater at OR-50 boiler:
    Investor: Posteor Sp. z o.o.
  6. Replacement of the cast iron water heater for a steel one at OR-50 boiler:
    Investor: Posteor Sp. z o.o.
  7. Development of the reduction and 23/5 bar steam cooling station:
    Investor: Arctic Paper Kostrzyn S.A.
  8. Development of the reduction and 20/13 bar steam cooling station from the turbine extraction, including the new steam DN 150 ? DN 65 condensate system to Hanke Tissue Sp. z o.o.:
    Investor Hanke Tissue Sp. z o.o.
  9. Dual feed of a 23/40-bar steam of TP3 steam:
    Investor: Arctic Paper Kostrzyn S.A.
  10. Development of KG4 heat recovery system from waste gas:
    Investor: Arctic Paper Kostrzyn S.A.
  11. Development of 6 MW turbo-system. Pipelines WP, SP and NP:
    Investor: Posteor Sp. z o.o.