Major projects:
A list of major investment projects completed in the years from 2007 to 2011:
- Steam feed for the new Spirax:
Investor: Arctic Paper Kostrzyn S.A.
- Recovery and re-use of waste heat in the turbine house:
Investor: Arctic Paper Kostrzyn S.A.
- Erecting anti-pressure steam and exhaust steam DN 500 pipelines from the turbine:
Investor: Posteor Sp. z o.o.
- Modernisation of the steam- condensate system at MP1:
Investor: Posteor Sp. z o.o.
- Replacement of banks of tubes of the steam superheater at OR-50 boiler:
Investor: Posteor Sp. z o.o.
- Replacement of the cast iron water heater for a steel one at OR-50 boiler:
Investor: Posteor Sp. z o.o.
- Development of the reduction and 23/5 bar steam cooling station:
Investor: Arctic Paper Kostrzyn S.A.
- Development of the reduction and 20/13 bar steam cooling station from the turbine extraction, including the new steam DN 150 ? DN 65 condensate system to Hanke Tissue Sp. z o.o.:
Investor Hanke Tissue Sp. z o.o.
- Dual feed of a 23/40-bar steam of TP3 steam:
Investor: Arctic Paper Kostrzyn S.A.
- Development of KG4 heat recovery system from waste gas:
Investor: Arctic Paper Kostrzyn S.A.
- Development of 6 MW turbo-system. Pipelines WP, SP and NP:
Investor: Posteor Sp. z o.o.